Concrete for a 16×25 slab
4.94 cubic yards (245 × 80 lb bags)
for a 16×25 ft slab 4 inches thick: 133.3 cu ft. Bag counts include 10% extra; at 6 inches you need 7.41 yards.
A 16×25 foot slab covers 400 square feet. At the standard 4 inch thickness for a patio, walkway or shed floor, that is 133.3 cubic feet of concrete, or 4.94 cubic yards. At this size ready-mix is cheaper and far less work than bags: about 5.5 yards, roughly $908 before delivery fees, against $1,593 for 245 bags of 80 lb mix.
Concrete for a 16×25 slab by thickness
| Thickness | Cubic yards | Cubic feet | 80 lb bags | 60 lb bags | 40 lb bags |
|---|---|---|---|---|---|
| 3 in | 3.7 | 100 | 184 | 245 | 367 |
| 4 in | 4.94 | 133.3 | 245 | 326 | 489 |
| 5 in | 6.17 | 166.7 | 306 | 408 | 612 |
| 6 in | 7.41 | 200 | 367 | 489 | 734 |
| 8 in | 9.88 | 266.7 | 489 | 652 | 978 |
Bag counts include 10% extra for spillage and uneven ground. Cubic yards and cubic feet are the exact volume.
How it’s worked out
- Convert the thickness to feet: 4 in ÷ 12 = 0.333 ft.
- Multiply length × width × thickness: 25 × 16 × 0.333 = 133.33 cu ft.
- Divide by 27 for cubic yards: 133.33 ÷ 27 = 4.938 cu yd.
- Add 10% and divide by the bag yield: 146.67 ÷ 0.6 = 245 bags of 80 lb mix (rounded up).
Under the slab, plan on 4 inches of compacted gravel: about 4.94 cubic yards. For driveways and anything that carries a vehicle, go to 5 or 6 inches and add rebar or wire mesh.
Change the numbers
Other slab sizes
- 16×24 slab
- 16×26 slab
- 15×25 slab
- 16×22 slab
- 16×28 slab
- 14×25 slab
- 18×25 slab
- 16×20 slab
- 16×30 slab
- 12×25 slab
- 20×25 slab
- 16×18 slab
Questions
- How many bags of concrete do I need for a 16×25 slab?
- At 4 inches thick, a 16×25 slab takes 245 bags of 80 lb concrete mix, 326 bags of 60 lb mix or 489 bags of 40 lb mix, including 10% extra.
- How many yards of concrete for a 16×25 slab?
- 4.94 cubic yards at 4 inches thick, 6.17 at 5 inches and 7.41 at 6 inches, before adding extra for waste.
- How much does a 16×25 concrete slab cost?
- The concrete alone for a 4 inch 16×25 slab costs about $1,593 in 245 bags of 80 lb mix (at about $7 a bag) or about $908 for 5.5 yards of ready-mix (at about $165 a yard, before delivery fees). Professionally poured slabs usually run $6 to $12 per square foot, about $2,400 to $4,800 for 400 sq ft.
- How much does a 16×25 slab weigh?
- About 9.7 tons at 4 inches thick (concrete weighs about 145 lb per cubic foot).