Concrete for a 22×28 slab

7.6 cubic yards (377 × 80 lb bags)

for a 22×28 ft slab 4 inches thick: 205.3 cu ft. Bag counts include 10% extra; at 6 inches you need 11.41 yards.

A 22×28 foot slab covers 616 square feet. At the standard 4 inch thickness for a patio, walkway or shed floor, that is 205.3 cubic feet of concrete, or 7.6 cubic yards. At this size ready-mix is cheaper and far less work than bags: about 8.5 yards, roughly $1,403 before delivery fees, against $2,451 for 377 bags of 80 lb mix.

Concrete for a 22×28 slab by thickness

ThicknessCubic yardsCubic feet80 lb bags60 lb bags40 lb bags
3 in5.7154283377565
4 in7.6205.3377502753
5 in9.51256.7471628942
6 in11.413085657531130
8 in15.21410.775310041506

Bag counts include 10% extra for spillage and uneven ground. Cubic yards and cubic feet are the exact volume.

How it’s worked out

  1. Convert the thickness to feet: 4 in ÷ 12 = 0.333 ft.
  2. Multiply length × width × thickness: 28 × 22 × 0.333 = 205.33 cu ft.
  3. Divide by 27 for cubic yards: 205.33 ÷ 27 = 7.605 cu yd.
  4. Add 10% and divide by the bag yield: 225.87 ÷ 0.6 = 377 bags of 80 lb mix (rounded up).

Under the slab, plan on 4 inches of compacted gravel: about 7.6 cubic yards. For driveways and anything that carries a vehicle, go to 5 or 6 inches and add rebar or wire mesh.

Change the numbers

Concrete needed

7.6 cubic yards

205.3 cubic feet. With 10% extra, order 8.37 yards or 377 bags of 80 lb mix.

Area616 sq ft
Volume205.3 cu ft (7.6 cu yd)
80 lb bags377 (about $2,451)
60 lb bags502
40 lb bags753
Ready-mix to order8.5 yd (about $1,403 before delivery fees)
Weight of the slab14.9 tons

Other slab sizes

Questions

How many bags of concrete do I need for a 22×28 slab?
At 4 inches thick, a 22×28 slab takes 377 bags of 80 lb concrete mix, 502 bags of 60 lb mix or 753 bags of 40 lb mix, including 10% extra.
How many yards of concrete for a 22×28 slab?
7.6 cubic yards at 4 inches thick, 9.51 at 5 inches and 11.41 at 6 inches, before adding extra for waste.
How much does a 22×28 concrete slab cost?
The concrete alone for a 4 inch 22×28 slab costs about $2,451 in 377 bags of 80 lb mix (at about $7 a bag) or about $1,403 for 8.5 yards of ready-mix (at about $165 a yard, before delivery fees). Professionally poured slabs usually run $6 to $12 per square foot, about $3,696 to $7,392 for 616 sq ft.
How much does a 22×28 slab weigh?
About 14.9 tons at 4 inches thick (concrete weighs about 145 lb per cubic foot).