Concrete for a 25×30 slab

9.26 cubic yards (459 × 80 lb bags)

for a 25×30 ft slab 4 inches thick: 250 cu ft. Bag counts include 10% extra; at 6 inches you need 13.89 yards.

A 25×30 foot slab covers 750 square feet. At the standard 4 inch thickness for a patio, walkway or shed floor, that is 250 cubic feet of concrete, or 9.26 cubic yards. At this size ready-mix is cheaper and far less work than bags: about 10.25 yards, roughly $1,691 before delivery fees, against $2,984 for 459 bags of 80 lb mix.

Concrete for a 25×30 slab by thickness

ThicknessCubic yardsCubic feet80 lb bags60 lb bags40 lb bags
3 in6.94187.5344459688
4 in9.26250459612917
5 in11.57312.55737641146
6 in13.893756889171375
8 in18.5250091712231834

Bag counts include 10% extra for spillage and uneven ground. Cubic yards and cubic feet are the exact volume.

How it’s worked out

  1. Convert the thickness to feet: 4 in ÷ 12 = 0.333 ft.
  2. Multiply length × width × thickness: 30 × 25 × 0.333 = 250 cu ft.
  3. Divide by 27 for cubic yards: 250 ÷ 27 = 9.259 cu yd.
  4. Add 10% and divide by the bag yield: 275 ÷ 0.6 = 459 bags of 80 lb mix (rounded up).

Under the slab, plan on 4 inches of compacted gravel: about 9.26 cubic yards. For driveways and anything that carries a vehicle, go to 5 or 6 inches and add rebar or wire mesh.

Change the numbers

Concrete needed

9.26 cubic yards

250 cubic feet. With 10% extra, order 10.19 yards or 459 bags of 80 lb mix.

Area750 sq ft
Volume250 cu ft (9.26 cu yd)
80 lb bags459 (about $2,984)
60 lb bags612
40 lb bags917
Ready-mix to order10.25 yd (about $1,691 before delivery fees)
Weight of the slab18.1 tons

Other slab sizes

Questions

How many bags of concrete do I need for a 25×30 slab?
At 4 inches thick, a 25×30 slab takes 459 bags of 80 lb concrete mix, 612 bags of 60 lb mix or 917 bags of 40 lb mix, including 10% extra.
How many yards of concrete for a 25×30 slab?
9.26 cubic yards at 4 inches thick, 11.57 at 5 inches and 13.89 at 6 inches, before adding extra for waste.
How much does a 25×30 concrete slab cost?
The concrete alone for a 4 inch 25×30 slab costs about $2,984 in 459 bags of 80 lb mix (at about $7 a bag) or about $1,691 for 10.25 yards of ready-mix (at about $165 a yard, before delivery fees). Professionally poured slabs usually run $6 to $12 per square foot, about $4,500 to $9,000 for 750 sq ft.
How much does a 25×30 slab weigh?
About 18.1 tons at 4 inches thick (concrete weighs about 145 lb per cubic foot).

Related calculators