Concrete for a 28×50 slab

17.28 cubic yards (856 × 80 lb bags)

for a 28×50 ft slab 4 inches thick: 466.7 cu ft. Bag counts include 10% extra; at 6 inches you need 25.93 yards.

A 28×50 foot slab covers 1400 square feet. At the standard 4 inch thickness for a patio, walkway or shed floor, that is 466.7 cubic feet of concrete, or 17.28 cubic yards. At this size ready-mix is cheaper and far less work than bags: about 19.25 yards, roughly $3,176 before delivery fees, against $5,564 for 856 bags of 80 lb mix.

Concrete for a 28×50 slab by thickness

ThicknessCubic yardsCubic feet80 lb bags60 lb bags40 lb bags
3 in12.963506428561284
4 in17.28466.785611411712
5 in21.6583.3107014262139
6 in25.93700128417122567
8 in34.57933.3171222823423

Bag counts include 10% extra for spillage and uneven ground. Cubic yards and cubic feet are the exact volume.

How it’s worked out

  1. Convert the thickness to feet: 4 in ÷ 12 = 0.333 ft.
  2. Multiply length × width × thickness: 50 × 28 × 0.333 = 466.67 cu ft.
  3. Divide by 27 for cubic yards: 466.67 ÷ 27 = 17.284 cu yd.
  4. Add 10% and divide by the bag yield: 513.33 ÷ 0.6 = 856 bags of 80 lb mix (rounded up).

Under the slab, plan on 4 inches of compacted gravel: about 17.28 cubic yards. For driveways and anything that carries a vehicle, go to 5 or 6 inches and add rebar or wire mesh.

Change the numbers

Concrete needed

17.28 cubic yards

466.7 cubic feet. With 10% extra, order 19.01 yards or 856 bags of 80 lb mix.

Area1,400 sq ft
Volume466.7 cu ft (17.28 cu yd)
80 lb bags856 (about $5,564)
60 lb bags1141
40 lb bags1712
Ready-mix to order19.25 yd (about $3,176 before delivery fees)
Weight of the slab33.8 tons

Other slab sizes

Questions

How many bags of concrete do I need for a 28×50 slab?
At 4 inches thick, a 28×50 slab takes 856 bags of 80 lb concrete mix, 1141 bags of 60 lb mix or 1712 bags of 40 lb mix, including 10% extra.
How many yards of concrete for a 28×50 slab?
17.28 cubic yards at 4 inches thick, 21.6 at 5 inches and 25.93 at 6 inches, before adding extra for waste.
How much does a 28×50 concrete slab cost?
The concrete alone for a 4 inch 28×50 slab costs about $5,564 in 856 bags of 80 lb mix (at about $7 a bag) or about $3,176 for 19.25 yards of ready-mix (at about $165 a yard, before delivery fees). Professionally poured slabs usually run $6 to $12 per square foot, about $8,400 to $16,800 for 1400 sq ft.
How much does a 28×50 slab weigh?
About 33.8 tons at 4 inches thick (concrete weighs about 145 lb per cubic foot).