Pavers for a 20×30 patio
2970 pavers (4 × 8 in)
for 600 sq ft with 10% extra, on 7.41 cu yd of gravel base and 1.85 cu yd of bedding sand.
A 20×30 foot patio covers 600 square feet. Here is everything that goes into it, from the gravel base up.
Materials for a 20×30 patio
| Pavers (4 × 8 in, 10% extra) | 2970 |
|---|---|
| Gravel base, 4 in compacted | 7.41 cu yd (10.4 tons) |
| Bedding sand, 1 in | 1.85 cu yd |
| Polymeric joint sand | 10 × 50 lb bags |
| Edge restraint | 100 ft (whole perimeter) |
Pavers needed by paver size
| Paver size | Per sq ft | Pavers for 20×30 |
|---|---|---|
| 4 × 8 in brick paver | 4.5 | 2970 |
| 6 × 6 in paver | 4 | 2640 |
| 6 × 9 in paver | 2.67 | 1760 |
| 12 × 12 in paver | 1 | 660 |
| 16 × 16 in paver | 0.56 | 372 |
| 24 × 24 in paver | 0.25 | 165 |
Counts include 10% extra. Use 5% for a straight running bond with few cuts, and 15% for herringbone or curved edges.
Base gravel by itself: see gravel for a 20×30 area. Thinking about concrete instead? See concrete for a 20×30 slab.
Change the numbers
Other patio sizes
- 18×30 patio
- 20×25 patio
- 16×30 patio
- 20×24 patio
- 24×30 patio
- 15×30 patio
- 25×30 patio
- 14×30 patio
- 20×20 patio
- 12×30 patio
- 18×20 patio
- 16×20 patio
Questions
- How many pavers do I need for a 20×30 patio?
- 2970 standard 4 × 8 in pavers for 600 sq ft, including 10% extra for cuts and breakage. With 12 × 12 in pavers you need 660.
- How much gravel do I need for a 20×30 patio?
- 7.41 cubic yards (about 10.4 tons) for a 4 inch compacted base, or 11.11 cubic yards at 6 inches.
- How much sand do I need for a 20×30 patio?
- 1.85 cubic yards of bedding sand for a 1 inch layer, plus about 10 bags of polymeric sand for the joints.
- How much does a 20×30 paver patio cost?
- Pavers alone run about $2,640 at $4 a square foot. Installed by a pro, a 600 sq ft patio typically costs $9,000 to $15,000.